1.3 MW grid-tied factory rooftop solar plant

Solar EPC Contractor, Antalya

Antalya Solar Energy EPC for Commercial and Industrial Plants

We design, procure, build and operate rooftop and ground-mount solar plants from 100 kWp to multi-megawatt scale, backed by yield simulation, grid application management and O&M contracts with performance-ratio reporting.

View Reference Plants
  • 4.5 MW industrial rooftop reference
  • Bankable P50/P90 yield reports
  • Single-point EPC responsibility
42 MWpInstalled capacity
85+Completed projects
250+Clients served
58,000 tCO₂ avoided

Equipment brands we install

Capabilities

Solar EPC services for every site type

From a single factory roof to a multi-megawatt field installation, each service is delivered under one contract by one accountable engineering team.

42 MWpInstalled capacity
85+Completed projects
250+Clients served
58,000 tCO₂ avoided

Who we are

An engineering-led solar EPC partner for Mediterranean businesses

Antalya Solar Energy Co. is a solar EPC contractor serving manufacturers, hotels, logistics operators, farms and energy investors across Antalya and the Mediterranean coast. We take each project from the first electricity-bill analysis through yield simulation, structural checks, EDAŞ grid application, construction, commissioning and TEDAŞ acceptance, then stay involved through a measurable O&M contract. Our references include industrial rooftops of 450 kW, 860 kW, 970 kW, 1.3 MW and 4.5 MW, plus ground-mounted plants of 680 kW and 2.4 MW.

Commercial solar is a capital decision, so we treat it like one. Every proposal is built on twelve months of consumption data, an hourly load-profile match and a simulated performance ratio rather than rules of thumb. You receive a clear scope, a fixed technical specification and a realistic payback range, with exact pricing confirmed after the free site survey. Once the plant is live, monitoring data and scheduled maintenance protect the yield you invested in.

  • In-house feasibility and yield simulation
  • Grid application handled end to end
  • Industrial roofs up to 4.5 MW delivered
  • O&M contracts with PR reporting
4.4 kW off-grid solar system at a garden home

References

Reference plants across the Antalya region

Industrial rooftops, ground-mount plants and hybrid systems we have engineered and built, from compact off-grid units to a 4.5 MW roof.

1.3 MW grid-tied factory rooftop solar plant
26 kW off-grid solar array on a villa with a pool
450 kW business rooftop solar system
7.7 kW off-grid solar system on a seaside villa
2.4 MW grid-tied ground-mount solar plant
3.3 kW grid-tied solar on a tiled roof
4.5 MW industrial rooftop solar installation
4.4 kW off-grid solar system at a garden home
680 kW ground-mounted solar farm

Delivery model

A five-stage EPC process with clear milestones

Every project follows the same documented sequence, so timelines, responsibilities and approvals are visible from day one.

  1. 1

    Survey and feasibility

    Site survey, consumption analysis, shading study and yield simulation produce a feasibility report with capacity, expected output and a payback range.

  2. 2

    Engineering and permits

    Layout, string design, structural checks and single-line diagrams are finalised, and the EDAŞ grid application is prepared and submitted.

  3. 3

    Procurement and logistics

    Modules, inverters, mounting structures and protection equipment are specified, ordered and scheduled to arrive in line with the build plan.

  4. 4

    Construction and commissioning

    Qualified crews install, test and commission the plant, then we coordinate TEDAŞ acceptance and energisation with the distribution company.

  5. 5

    Monitoring and O&M

    Remote monitoring, periodic inspections, cleaning and performance reports protect yield and warranty conditions throughout the plant's service life.

Why Antalya Solar Energy Co.

Engineering discipline from feasibility to O&M

Six principles that shape how we scope, build and operate every commercial solar plant we deliver.

Data-driven feasibility

Proposals are built on twelve months of invoices, hourly load matching and simulated yield, so the business case survives scrutiny from finance and engineering teams.

Single-point responsibility

One contract covers design, procurement, construction, grid application and commissioning, so interface risk between subcontractors never becomes your problem on site.

Performance-ratio focus

We design for and report performance ratio, the metric that shows how well a plant converts available sunlight into delivered energy year after year.

Proven MW-scale references

Industrial rooftops from 450 kW to 4.5 MW and a 2.4 MW ground-mount plant demonstrate delivery capability at genuine commercial and utility scale.

Regulatory process ownership

We prepare and track the EDAŞ connection application, project approval and TEDAŞ acceptance, keeping you informed at every regulatory milestone of the project.

Long-term O&M contracts

Monitoring, preventive maintenance, cleaning schedules and fault response keep the plant producing to specification across its full operating life.

Quick estimate

Estimate your plant size and payback

Enter your monthly electricity spend for an indicative system size and savings range. A site survey confirms the final engineering figures.

System type

Preliminary estimate based on an average Antalya yield of 1,600 kWh/kWp per year, current tariffs and typical turnkey costs. Exact figures follow the free site survey.

Annual savings–
Recommended system size
–
Panels
–
Annual production
–
Estimated investment
–
Payback period
–
CO₂ avoided per year
–

Storage references

Hybrid and battery installations in the field

Battery-backed systems in Döşemealtı, Kemer, Konyaaltı, Kundu, Çakırlar and Manavgat, sized between 15 kW and 40 kW.

15 kW Döşemealtı 15 kW hybrid inverter and lithium battery installation
15 kW Kemer 15 kW hybrid solar and battery system
15 kW Konyaaltı 15 kW hybrid inverter installation
15 kW Konyaaltı 15 kW hybrid system with battery cabinet
20 kW Kundu 20 kW hybrid solar with energy storage
15 kW Çakırlar 15 kW hybrid solar panel system
40 kW Manavgat 40 kW hybrid inverters and battery room

Antalya solar energy: why the commercial business case is strong

Antalya is one of Turkey's best-irradiated provinces, and its commercial load profile suits solar unusually well. Hotels, cold stores and factories run their heaviest cooling and process loads between late morning and late afternoon, exactly when a south-facing or east-west array is producing most. That overlap is what turns generated kilowatt-hours into displaced grid purchases. For commercial solar energy in Antalya, the decisive question is therefore less about sunshine and more about how closely the plant is sized to the site's real hourly demand.

Our feasibility work starts with that match. We build an hourly consumption profile from metering data and invoices, simulate generation for the specific roof or parcel, and calculate the share of output the facility can use directly. The result is a capacity recommendation, an expected specific yield, a performance ratio target and a payback range that a finance team can test. Exact pricing follows the free site survey, because structural condition, cable routes and grid connection costs vary from one site to the next.

Industrial solar in Turkey: regulation, grid connection and sizing

Industrial solar in Turkey operates mainly under the Unlicensed Electricity Generation Regulation (Lisanssız Elektrik Üretim Yönetmeliği). Projects need a connection opinion and agreement from the regional distribution company (EDAŞ), an approved electrical design and a TEDAŞ acceptance before energisation. The rules on capacity limits, consumption-linked sizing and how surplus energy is netted or purchased have been revised several times, so any plan should be checked against the current EPDK framework at the time of application rather than on assumptions from earlier years.

As a solar EPC contractor in Antalya, we run that process for clients from start to finish: preparing the application file, tracking the connection opinion, adapting the design to any grid conditions imposed and coordinating acceptance testing. For larger self-consumption sites and ground-mounted plants, we also review transformer capacity, protection settings and medium-voltage connection options early, because grid constraints are often the factor that sets the realistic plant size long before roof area or budget does.

Ground-mount solar in Antalya and long-term O&M

Where roof space runs out, ground-mount plants take Antalya solar energy to multi-megawatt capacity. A successful field plant depends on parcel zoning, slope and orientation, distance to a suitable connection point, geotechnical conditions for piling, and year-round access for construction and maintenance vehicles. Our 680 kW and 2.4 MW ground plants were delivered against exactly that checklist, from early land screening through mounting structure design, inverter stations and medium-voltage works to final commissioning.

Building the plant is only half of the investment story. Dust, pollen, coastal humidity and summer heat all erode output when a plant is left unattended. Our O&M contracts combine remote monitoring with scheduled inspections, thermographic checks, module cleaning plans and inverter servicing, and they report performance ratio against the design model. That transparency lets asset owners spot underperformance early and keep warranty conditions intact for the full operating life of the plant.

Site footage

Installation videos from completed projects

Real installations in Belek, Döşemealtı, Feslikan, Geyikbayırı, Kemer, Manavgat and Çakırlar, plus two customer video reviews.

Customer video reviews

FAQ

Questions buyers ask before signing an EPC contract

What does a solar EPC contract cover?

An EPC contract places engineering, procurement and construction under one contractor. With us that includes the feasibility study, design, equipment supply, installation, grid application, commissioning and TEDAŞ acceptance. Operations and maintenance can be added as a separate O&M contract, so a single accountable team looks after the plant from first survey to long-term performance.

What project sizes do you take on?

Our core work is commercial and industrial plants from around 100 kWp up to multi-megawatt scale, including industrial rooftops of 860 kW, 1.3 MW and 4.5 MW. We also deliver smaller residential, hybrid and off-grid systems, designed with the same engineering standards and documentation as our larger projects.

How long does a commercial rooftop project take?

For a mid-sized industrial roof, the overall timeline is typically a few months from contract to energisation. Physical installation is usually the shortest phase; the grid application, approvals and TEDAŞ acceptance determine most of the schedule. We issue a milestone plan at contract stage and update it as the distribution company responds.

What payback period should we expect?

Payback depends on the share of solar output used on site, your all-in electricity tariff, roof or land conditions and the financing structure. Facilities with strong daytime demand typically see the fastest returns. We give a payback range in the feasibility report and confirm exact pricing after the free site survey, rather than quoting generic figures.

What is performance ratio and why does it matter?

Performance ratio (PR) compares the energy a plant actually delivers with what it could theoretically produce from the measured sunlight. It captures losses from heat, soiling, cabling, inverters and downtime. Because it is largely independent of weather, PR is the clearest way to judge whether a plant has been engineered and maintained well over time.

Do you handle the grid connection and permits?

Yes. We prepare the application to the regional distribution company (EDAŞ), follow the connection opinion and agreement, adapt the design to any grid conditions and coordinate TEDAŞ acceptance before energisation. Because the regulations change periodically, we confirm the current EPDK rules on capacity limits and surplus energy for each project at feasibility stage.

Will installation disrupt our production or guests?

We plan site work around your operations. Most rooftop work proceeds without interrupting production, with crane lifts, cable routing and the final switchboard connection scheduled at agreed times, often outside shift changes or check-in peaks. Safety procedures, roof access control and daily coordination with your facility manager are part of every project.

What does your O&M contract include?

Our O&M contracts typically include remote monitoring, fault alarms, scheduled preventive inspections, thermographic checks, module cleaning plans, inverter servicing and periodic performance reports benchmarked against the design yield. Scope and response times are agreed per site, so a 450 kW factory roof and a 2.4 MW ground plant each get a regime suited to their risk profile.

Blog

Latest from the blog

Start with a free feasibility review

Share twelve months of electricity bills and your site location. Our engineers will assess roof or land suitability, outline a plant size and arrange a free on-site survey.

Contact

Contact Our Solar EPC Team

Tell us about your roof, land or facility. Our engineers respond to commercial enquiries promptly and arrange a free site survey across Antalya and the Mediterranean coast.

Barış Mah. Barış Manço Bulv. No 49/A
Kepez / Antalya

The map loads from Google Maps when you click.

Request a feasibility review

Share your site location, project type and approximate monthly electricity spend. An engineer will contact you to plan the next steps.