Solar EPC Frequently Asked Questions
Straight answers to the questions facility managers, CFOs and investors raise when planning a commercial or utility-scale solar plant in Antalya.
EPC contracts and project delivery
What is included in a turnkey solar EPC scope?
A turnkey scope normally covers the site survey, feasibility study, detailed engineering, equipment procurement, mounting and electrical installation, grid application, testing, commissioning and handover documentation. We define the scope boundaries in writing, for example whether transformer works, roof repairs or fencing are included, so there are no grey areas once construction starts.
Who manages the project on our side and on yours?
You nominate a single contact, usually the facility or technical manager. On our side, one project manager coordinates engineering, procurement, site crews and the regulatory process. Regular progress updates and a shared milestone plan keep both teams aligned from contract signature to TEDAŞ acceptance.
What information do you need before the site survey?
Ideally twelve months of electricity invoices, the site address, roof drawings or building plans if available, and any metering data from your energy management system. For ground-mount projects, the parcel details and zoning status are essential. With this information we can prepare a meaningful preliminary assessment before visiting.
Do you work outside the Antalya metropolitan area?
Yes. We regularly deliver projects along the whole Mediterranean coast, including Alanya, Manavgat, Side, Serik, Belek, Kemer, Kumluca, Kaş and Gazipaşa. Being based in Kepez keeps travel times short for surveys, construction supervision and O&M visits across the province.
Can the plant be expanded later?
Expansion is possible if it is planned for. We can reserve inverter capacity, cable routes and switchboard space during the first phase. A capacity increase usually requires a new or amended grid application, so we assess the regulatory conditions for the extension at the time it is needed.
Engineering and technology
How do you check whether our roof can carry a solar plant?
We inspect the roof covering, purlins and main structure, review available drawings and calculate the additional dead load and wind loads from the mounting system. On older or lightweight steel roofs, a structural engineer's assessment may recommend reinforcement or a lighter mounting solution. No design is finalised until the structure has been verified.
Which module and inverter technologies do you use?
We specify Tier-1 monocrystalline modules, often bifacial or TOPCon types for ground plants, and string inverters from established manufacturers for most commercial roofs. The choice depends on roof geometry, shading, temperature behaviour, warranty terms and service availability in Turkey, and is documented in the feasibility report.
What specific yield can a plant in Antalya achieve?
Antalya enjoys high irradiance, and well-designed plants typically achieve strong specific yields by Turkish standards. The actual figure depends on orientation, tilt, shading, soiling and module temperature. We calculate a site-specific P50 and P90 estimate rather than quoting a regional average, because the difference between two roofs can be significant.
How do you manage heat and soiling losses?
Summer module temperatures reduce output, so we allow ventilation gaps under arrays, size cables to limit losses and choose modules with favourable temperature coefficients. Soiling from dust, pollen and nearby industry is addressed with an agreed cleaning schedule, timed using monitoring data rather than fixed dates alone.
What monitoring do commercial plants receive?
Each plant is connected to a monitoring platform that records inverter and string data, generation and, where metering allows, on-site consumption. Alarms notify our O&M team of faults, and periodic reports compare actual output and performance ratio with the design model.
Regulation and grid connection
Which regulation applies to commercial rooftop solar?
Most self-consumption plants fall under Turkey's Unlicensed Electricity Generation Regulation (Lisanssız Elektrik Üretim Yönetmeliği). It sets out how plants connect to the distribution grid and how surplus energy is treated. The detailed rules have been amended several times, so we verify the current EPDK provisions for every project at feasibility stage.
What role do EDAŞ and TEDAŞ play?
The regional distribution company (EDAŞ) evaluates the connection application, issues the connection opinion and signs the connection agreement. Project approval and acceptance procedures confirm that the installation meets the approved design and safety rules before energisation. We prepare the files and coordinate each step with the relevant authorities.
How does net metering work in Turkey today?
Under the unlicensed framework, generation is offset against consumption at the same connection point and surplus energy can be settled with the supply company. The settlement period, pricing of surplus and sizing limits relative to consumption have changed over time. We explain the rules that apply on your application date and model the economics accordingly.
Can a grid connection request be refused?
Yes, if the local network lacks capacity at that point or the request does not meet the regulatory conditions. In such cases the distribution company may propose a reduced capacity or a different connection point. Early grid screening during feasibility helps avoid surprises and lets us size the plant realistically.
Do ground-mount plants need additional permits?
Usually yes. Depending on the land, zoning approval, a non-agricultural use permit or environmental screening may be required in addition to the grid application. Requirements differ by parcel and plant size, so we review the land status at the very start of a ground-mount feasibility study.
Finance, O&M and performance
How is the payback of a commercial plant calculated?
We compare the investment with the annual value of energy the plant displaces or exports, using your all-in tariff, the simulated yield, the self-consumption ratio, degradation and O&M costs. The model shows a payback range and cash flow over the plant's life. Exact pricing is confirmed after the site survey.
Which financing options are available?
Clients typically fund plants from their own capital or through bank loans, including green or energy-efficiency credit lines where banks offer them. Terms vary by institution and change over time, so we provide the technical documentation lenders need and leave financial advice to your bank or advisor.
What happens if the plant underperforms?
Monitoring compares actual output with the expected yield for the measured irradiance. If performance ratio drops, our O&M team investigates causes such as string faults, inverter errors, soiling or shading changes, and carries out corrective work. Warranty claims with manufacturers are handled with documented test data.
How often should a commercial plant be maintained?
A typical regime includes continuous remote monitoring, at least one comprehensive preventive inspection per year, thermographic checks and cleaning scheduled according to soiling levels. Coastal and industrial sites may need more frequent visits. We set the frequency in the O&M contract based on site conditions and plant size.
Can we report the plant's carbon savings?
Yes. Monitoring data provides verified generation figures, which can be converted into avoided emissions using an appropriate grid emission factor. Many clients use these figures in sustainability reporting or customer questionnaires. We supply the generation data; the reporting methodology should follow your chosen framework.
Start with a free feasibility review
Share twelve months of electricity bills and your site location. Our engineers will assess roof or land suitability, outline a plant size and arrange a free on-site survey.