Rooftop Solar EPC: Antalya Solar Energy on Commercial Roofs

Turn factory, warehouse and hotel roofs into productive Antalya solar energy assets with engineered rooftop plants, delivered turnkey from structural assessment to TEDAŞ acceptance and long-term O&M.

Call now

The flat and low-pitched roofs of factories, warehouses, cold stores and hotels are some of the most underused assets in the Antalya region. Every summer they absorb intense sunshine and pass the heat into the building below, while the same business pays for electricity to cool it. A professionally engineered rooftop solar plant turns that surface into a source of Antalya solar energy, produced at the point of consumption, with no land purchase and no long transmission route.

Antalya Solar Energy Co. delivers rooftop plants as a full EPC contractor: structural assessment, yield simulation, electrical design, grid application, construction, commissioning and long-term O&M. Our industrial rooftop references range from 450 kW to 4.5 MW, and every one of them started with the same question: what can this particular roof carry, and how much of the energy it produces can the building actually use?

Why industrial roofs are the best real estate for Antalya solar energy

A rooftop plant uses space that already exists and is already connected. The building's transformer and main distribution board provide the grid interface, so connection works are usually simpler than for a field plant. Generation flows straight into the loads beneath it, which keeps losses low and maximises the share of output that replaces purchased electricity. And because commercial demand peaks with cooling loads in the sunniest months, rooftop solar energy in Antalya tends to be produced exactly when the building needs it most.

There is also a thermal side benefit. Modules shade the roof covering, which can reduce heat gain into the building during summer, an effect that facility managers of uninsulated warehouses notice quickly.

Structural assessment comes before design

No rooftop design is finalised until the structure has been verified. On every project our engineers:

  • Inspect the roof covering, fixings, purlins and main frame for condition and corrosion
  • Review available structural drawings, or document the structure on site where drawings are missing
  • Calculate the additional dead load of modules and mounting, plus wind and snow loads for the location
  • Check water drainage paths, skylights, smoke vents and expansion joints that the layout must respect
  • Recommend reinforcement, a lighter mounting solution or a reduced layout where capacity is limited

This step protects both the building and the investment. A plant that has to be partly dismantled for roof repairs a few years after commissioning loses far more value than a careful survey costs.

Mounting systems by roof type

Roof typeTypical mounting solutionKey design consideration
Trapezoidal steel sheetShort rails fixed to the sheet ribsSheet thickness, fixing pull-out values, sealing
Standing-seam metalNon-penetrating seam clampsPreserving the roof warranty, clamp compatibility
Concrete flat roofTilted frames, ballasted or anchoredBallast weight versus structural capacity, waterproofing
Membrane roofBallasted low-tilt system with protective matsMembrane protection, wind uplift at roof edges
Sandwich panel roofRails fixed to the panel or purlinsPanel load capacity, thermal bridging, sealing

Orientation follows the roof. East-west layouts at low tilt often fit more capacity on a flat roof and spread generation across the day, while south-facing layouts maximise yield per module. We model both where the roof allows and choose on the basis of self-consumption, not just annual kilowatt-hours.

Electrical design for large roofs

On a multi-megawatt roof, electrical design determines both losses and maintainability. We distribute string inverters across the roof or in dedicated inverter areas to keep DC cable runs short, group strings by orientation and shading conditions, and size cables to keep losses within the design target. AC collection is coordinated with the existing main board or a dedicated transformer, and protection devices are selected to match the site's short-circuit levels and the distribution company's connection conditions. Where the connection agreement limits export, inverters are configured to reduce output automatically rather than exceed the agreed value.

Monitoring is designed in from the start rather than added at the end. Each inverter is connected to the monitoring platform, and where the site has suitable metering, consumption data is integrated as well, so the client sees generation, self-consumption and grid exchange side by side from the first day of operation.

Fire safety, access and roof warranty

Industrial roofs carry obligations towards insurers, fire services and roofing manufacturers. Our layouts keep access paths and fire-break corridors clear, keep modules away from smoke vents and firewalls, and use rated DC cabling and connectors throughout. Isolation devices and clearly labelled cable routes support emergency services. Where an insurer or roofing warranty imposes specific requirements, we incorporate them into the design before installation begins.

Maintenance access is part of the same plan. Walkways between module rows, safe ladder or stair access and anchor points for fall protection allow technicians to clean modules, inspect fixings and replace components without damaging the roof covering or putting anyone at risk.

Antalya solar rooftop references: from 450 kW to 4.5 MW

  • 4.5 MW on-grid industrial roof: our largest rooftop plant, with distributed inverters and staged construction across a very large roof area.
  • 1.3 MW on-grid industrial roof: a self-consumption plant sized against the facility's daytime demand.
  • 970 kW and 860 kW on-grid industrial roofs: mid-sized plants on production buildings with steady weekday loads.
  • 450 kW on-grid industrial roof: a compact plant integrated into an existing main distribution board.
  • 3.3 kW tiled roof: proof that the same documentation standards apply at residential scale.

Photos and videos of these installations are on our projects page.

Delivery sequence for a rooftop project

  1. Survey and data review: invoices, roof inspection, electrical infrastructure and access.
  2. Feasibility report: layout, P50 and P90 yield, self-consumption ratio and payback range.
  3. Grid application: file prepared and submitted to the regional distribution company (EDAŞ).
  4. Detailed engineering: structural verification, string design, protection and single-line diagrams.
  5. Construction: mounting, modules, cabling and inverters under a written method statement.
  6. Commissioning and acceptance: string tests, inverter configuration and TEDAŞ acceptance before energisation.
  7. Handover and O&M: as-built documents, monitoring access and maintenance plan.

Yield, performance ratio and rooftop O&M

Rooftop plants generating solar energy across Antalya face specific operating challenges: dust from nearby roads and industry, bird droppings, heat build-up under modules and limited access for cleaning. We design for ventilation gaps, plan safe cleaning access and connect every plant to a monitoring platform. Under an O&M contract, our team compares actual output with the expected yield for the measured irradiance, tracks performance ratio over time and investigates any drop before it becomes a lasting loss.

For a broader view of self-consumption sizing and business cases, see our commercial and industrial solar service. Where evening demand or outage risk matters, rooftop plants can be combined with battery storage.

FAQ

Questions about this service

What roof types can carry an industrial solar plant?

Trapezoidal and standing-seam steel, concrete flat roofs and membrane roofs are all suitable, provided the structure can take the extra load. We assess purlins, fixings and wind exposure for each roof and choose a clamp, rail or ballasted system accordingly.

How large can a rooftop plant be?

Our largest rooftop reference is a 4.5 MW industrial roof, alongside 450 kW, 860 kW, 970 kW and 1.3 MW plants. In practice, the limit is set by usable roof area, structure, self-consumption and the grid connection capacity approved by the distribution company.

Does a rooftop plant affect the roof warranty?

It can if fixings are poorly chosen. We prefer non-penetrating clamps on standing-seam roofs and certified sealing solutions where penetration is unavoidable, and we coordinate with the roofing manufacturer or contractor when an existing warranty must be preserved.

How is fire safety addressed on industrial roofs?

We keep access and fire-break corridors free, use properly rated DC cabling and connectors, install isolation devices and document cable routes for emergency services. Where your insurer has specific requirements, we incorporate them into the design before installation starts.

Start with a free feasibility review

Share twelve months of electricity bills and your site location. Our engineers will assess roof or land suitability, outline a plant size and arrange a free on-site survey.